Common Building, Construction and Engineering Terms
Addendum
Written information issued during bidding to clarify, correct or modify the original bidding documents. Accepted addenda usually become part of the construction contract.
Alternate Bid
A separate price submitted for a specified change to the base bid, such as using a different material or construction method. The amount may be added to or deducted from the base price.
Architect's Supplemental Instruction (ASI)
A document an architect uses to clarify the construction documents or order a minor change that does not alter the contract price or completion date.
As-Built Drawings
Updated drawings that record changes made during construction. They show the final locations, dimensions and arrangement of building components.
Assignable Square Footage (ASF)
The floor area available for a designated use, such as an office, classroom, laboratory or storage room. It generally excludes corridors, mechanical spaces, walls and other shared areas.
Bidding Documents
The materials provided to prospective contractors when inviting bids. They may include instructions, bid forms, drawings, specifications, proposed contract terms and addenda.
Building Envelope
The physical components that separate a building's interior from exterior conditions. The envelope commonly includes the roof, exterior walls, windows, doors, foundations, insulation and weather barriers.
Building Information Modeling (BIM)
A process for creating and managing a digital model of a building or infrastructure project. The model can include information about its design, materials, energy and utility systems, costs, schedule and maintenance.
Change Order
A written amendment authorizing a change to the construction contract. It may adjust the work, contract price, project schedule or all three.
Construction Documents
The detailed drawings and written specifications used to price, permit and construct a project. They communicate dimensions, materials, systems, installation requirements and other technical information.
Construction Manager at Risk (CMAR)
A project delivery method in which the owner contracts separately with the designer and construction manager. The construction manager advises during design and later takes responsibility for completing the construction work under the contract.
Constructability Review
A structured review of drawings, specifications and project requirements to identify conflicts, missing details, impractical methods or other issues that could affect construction.
Critical Path
The sequence of dependent activities that determines the shortest possible project duration. Delaying one of these activities usually delays the entire project unless the schedule is adjusted elsewhere.
Date of Substantial Completion
The date when construction is complete enough for the owner to occupy or use the project for its intended purpose, although minor corrective work may remain.
DWG
A digital file format commonly used to store two-dimensional and three-dimensional design data for buildings, products and manufacturing equipment. It is associated with AutoCAD but can also be opened by many other computer-aided design programs.
Estimate
A forecast of the labor, materials, equipment, services and other costs required to complete a defined scope of work.
Feasibility Study
An early evaluation of whether a proposed project is practical and achievable. It may examine the site, budget, schedule, technical requirements, utilities, regulations, financing and potential risks.
Furniture, Fixtures and Equipment (FF&E)
Movable or replaceable items used within a completed building, such as desks, chairs, tables, shelving, laboratory equipment and certain appliances.
General Conditions
Contract provisions that explain administrative procedures and the responsibilities of the owner, contractor, designer and other project participants.
Geographic Information System (GIS)
A digital system used to collect, organize, analyze and display location-based information. GIS can support site planning, utility mapping, infrastructure management and environmental analysis.
Global Positioning System (GPS)
A satellite-based navigation system that provides location and time information. Construction and engineering teams use GPS for surveying, mapping, machine guidance, field data collection and transportation and logistics operations.
Gross Square Footage (GSF)
The total floor area within a building's exterior walls. It includes assignable rooms as well as corridors, stairs, mechanical spaces, structural areas and other support spaces.
Guaranteed Maximum Price (GMP)
The highest amount an owner agrees to pay a contractor for defined work, subject to approved changes, allowances and other conditions stated in the contract.
Job Order Contracting (JOC)
A procurement method that uses a long-term contract and established unit prices to complete recurring repairs, renovations and minor construction projects.
Mechanical, Electrical and Plumbing (MEP)
The building systems that provide services such as heating, cooling, ventilation, power, lighting, water, drainage and fire protection. MEP drawings coordinate these systems with the architectural and structural design, while related industrial services support their maintenance, troubleshooting and repair.
Performance Specifications
Requirements that state the results, quality or operating standards a completed product or system must achieve without prescribing every material or installation method.
Plan Check
A review conducted by a building department or another authority to determine whether project plans comply with applicable building, fire, zoning, accessibility and engineering requirements.
Preliminary Design
A design stage in which the project's layout, dimensions, materials, systems and major components are developed in greater detail before construction documents are prepared.
Project Program
A predesign document describing the spaces, functions, occupancy needs, equipment, infrastructure and other physical requirements that the completed project must accommodate.
Punch List
A list of unfinished or deficient work identified near the end of construction.
Request for Information (RFI)
A formal question submitted by a contractor or another project participant to clarify drawings, specifications, contract requirements or site conditions.
Request for Proposal (RFP)
A document inviting qualified firms to propose how they would provide a service or complete a project. Responses may be evaluated on qualifications, approach, schedule and price.
Renovation
Work performed to update, repair, reconfigure or improve an existing building or space without replacing the entire structure.
Rough Order of Magnitude (ROM)
An early estimate of cost or duration prepared before the project scope and design are fully defined.
Schedule of Values
An itemized breakdown showing how the total contract price is divided among different portions of the work. It is commonly used to review requests for progress payments.
Schematic Design
The initial design phase that establishes the project's general layout, scale, relationship between spaces and overall approach.
Scope of Work
A written description of the tasks, responsibilities, deliverables, materials and limits included in a project or contract.
Specifications
Written requirements for a project's materials, products, performance, installation, workmanship, testing and quality.
Time and Materials (T&M)
A payment arrangement based on hours worked, materials purchased, equipment used and agreed fees or markups.
Value Engineering
A review of materials, systems and construction methods intended to control costs while maintaining the project's required function, quality, safety and performance.
“While engineering has historically been a field dominated by men, they are not the only ones to have made major accomplishments in this area. There have been, and continue to be, numerous highly successful female engineers. While their accomplishments are well-known, their names may not be universally recognized by those outside of their field. Through education, people can acknowledge and celebrate the contributions of famous female engineers and, as a result, encourage more girls to pursue engineering as a future career path.
Women make up more than 51 percent of the population but less than 15 percent of engineers. The lack of women in the science, technology, engineering, and math (STEM) fields threatens to reduce the diversity of talent that is necessary for the 21st century. The potential amount of talent lost as a result is unknown but clearly significant in magnitude. One of the ways to alleviate the shortage of women in the engineering fields is by offering scholarships as an incentive to take up engineering as a major in college. A variety of scholarship programs are available today that are geared toward encouraging women to become engineers.”
Hedy Lamarr: “Hedy Lamarr was the inventor of frequency-hopping and spread-spectrum technology. This patented work became the basis of not only U.S. Navy technology but also Wi-Fi and Bluetooth technology that the Internet and computers use today. Visit the University of Houston’s Engines of Our Ingenuity website here for a more in-depth look at the life of Hedy Lamarr.”
Edith Clarke: “Edith Clarke was the first woman to earn a Master of Science degree in electrical engineering at the Massachusetts Institute of Technology. She invented a graphical calculator called the Clarke calculator, for which she received a patent in 1925.”
Helen Augusta Blanchard: “Click to read about Helen Augusta Blanchard on the Museum of American Heritage’s website. Blanchard made nearly 30 inventions, including the patented Blanchard overseaming machine, a version of which is on display at the Smithsonian Institute’s Museum of American History. She also invented another famous device, the zigzag overstitching machine.”
Sally Ride: “Visit the UC San Diego Sally Ride Science website to read about Dr. Sally Kristen Ride, America’s first female astronaut. She earned her bachelor’s, master’s and Ph.D. in physics at Stanford University and joined NASA in 1978. She was one of the developers of the space shuttle’s robot arm and took her first of two space flights in 1983. She also participated in the investigations concerning the Challenger and Columbia disasters.”
Kate Gleason: “The Rochester Institute of Technology presents a short biography of Kate Gleason on its Women in Engineering website. Gleason was born in Rochester, NY, in 1865 and became the first female engineering student at Cornell University in 1884. Gleason contributed heavily to the success of her father’s company, Gleason Works. In addition, she invented new ways of pouring concrete and was the first woman to become a member of the American Concrete Institute and the American Society of Mechanical Engineers. She was also the first woman to become the president of a major bank, the First National Bank of East Rochester. Rochester University’s Kate Gleason College of Engineering was named in honor of her many achievements.”
Harriet Ruth Brisbane Tracy: “Harriet Ruth Brisbane Tracy was credited with at least 11 patents that were related to elevators, folding beds, and sewing machines. Machines based on her elevator patents were featured in the 1893 Chicago World’s Fair.”
Olive Wetzel Dennis: “Click to read Goucher College’s article on Olive Dennis. Dennis was a math teacher who earned a master’s degree in mathematics in 1909 and then a bachelor’s in civil engineering from Cornell University in 1920. While working for the B&O Railroad, Dennis invented reclining seats for passenger trains, ceiling lights with adjustable brightness, and window vents with filters for keeping out dust.”
Dr. Patricia E. Bath: “Click to go to the National Library of Medicine’s website for a biography of Dr. Patricia Bath. Bath’s achievements began at the age of 16, when she joined a cancer research group funded by the National Science Foundation. Her research and findings were published by Dr. Robert Bernard while she was still a teenager. Bath received her doctorate from Howard University and is most famous for the invention of the Laserphaco Probe in 1986. The Laserphaco Probe, patented in 1988, is a machine that is widely used for modern cataract surgery and has been responsible for saving the eyesight of many patients.”
Grace Murray Hopper: “Learn about the life and achievements of Admiral Dr. Grace Hopper on Yale’s website. She is famous for inventing the first computer program compiler, which enabled programmers to write software using English-language code. The first compiled computer languages that came directly from her work were MATH-MATIC, FLOW-MATIC, and COBOL.”
Marie Curie: “The Nobel Prize website features a biography about Marie Curie, a Polish-born chemist and physicist. She is famous for her groundbreaking work in the field of radioactivity studies and was the first woman to earn a Nobel Prize. The curie (Ci), a unit that measures radioactivity, was named after her and her husband Pierre.”